Chimney & Skylight Flashing Calculator
Calculate flashing requirements for roof penetrations including chimneys, skylights, vents, and pipes. Get accurate material lists for base flashing, step flashing, counterflashing, and pipe boots.
Calculator
Results
How Flashing Calculations Work
Base Flashing = (Width + 12) / 10
Front pan pieces (10 per piece)
Step Flashing = ((Depth × 2 + Width) / 5)
Step flashing pieces per side
Counterflashing = (Width + Depth) × 2 / 10 + 4
Counter flashing with corners
Back Pan = (Width + 12) / 10
Back pan flashing
Cricket Required: Width > 30
Cricket needed for chimneys over 30 inches wide
Chimney flashing requires multiple layers of protection. The base flashing (front pan) catches water at the bottom, step flashing channels water down the sides, and counterflashing嵌入在砖石中。Back pan flashing provides additional protection on the upper side.
A cricket (or saddle) is required for chimneys wider than 30 inches to prevent snow and ice buildup behind the chimney.
Reference: ARMA and NRCA installation guidelines